Bathrooms are small rooms with big stakes: they fail expensively when done wrong. Hidden water damage, improper waterproofing, and undersized ventilation are the most common — and most costly — defects we're called to fix from other people's work.
ODL Construction remodels bathrooms to last. We waterproof to code, vent correctly, and finish with tile and fixtures set by craftsmen — whether it's a luxury primary spa, a guest bath, or making a powder room out of dead space.
From a Burlingame period bath that needs to keep its character to a brand-new walk-in shower for aging-in-place, we scope the work to how you'll actually use the room and build it watertight.
What's included
- Primary / en-suite spa bathrooms
- Walk-in and curbless showers (aging-in-place ready)
- Freestanding tubs and wet rooms
- Full waterproofing and proper ventilation
- Custom tile, vanities, and stone
- Heated floors and modern lighting
- Plumbing and electrical upgrades
- Permits and inspections
Our process
- 1
Consultation & assessment
We measure, check for existing water damage, and discuss layout, fixtures, and budget honestly.
- 2
Design & fixed proposal
We finalize layout, tile, and fixtures and deliver a fixed-scope proposal.
- 3
Permits
We pull plumbing, electrical, and any structural permits the city requires.
- 4
Build & waterproof
Demo, rough-in, code waterproofing, tile, and finish — done in the right order so it never leaks.
- 5
Walkthrough & inspection
We pass inspection, test everything, and complete the punch list.
Bathroom Remodeling cost in the Bay Area
Guest / hall bathroom
Full remodel, standard layout, mid-grade tile and fixtures.
$25,000 – $45,000
Primary bathroom
Larger footprint, walk-in shower, double vanity, upgraded finishes.
$45,000 – $80,000
Luxury spa bath
Custom stone, freestanding tub, heated floors, layout changes.
$80,000 – $150,000+
Typical Bay Area ranges, not a quote. Tile selection, layout changes, and what's found behind the walls move the number most. You get a fixed proposal after a site visit.
Remodel now, pay monthly. Ask about flexible financing options for your project.
Financing options →Timeline
Most bathroom remodels run 3–6 weeks of construction, plus design and permitting time.
Permits & code
Bathroom remodels require plumbing and electrical permits, with structural and energy review when the layout or footprint changes. We handle all permits and inspections.
Key things to consider
- Waterproofing method matters more than tile — insist it's done to code.
- Moving plumbing is the biggest cost driver; keeping fixtures in place saves significantly.
- Curbless / walk-in showers add aging-in-place value but need proper drainage design.
- Ventilation is non-negotiable in the Bay's humidity — undersized fans grow mold.